All works
2,149 works in State-wide works. 50 at a time.
- TTPS ES Circle EM III Unit IV Annual over hauling of LT SWGR Buses Modules Breakers electronic controller panels auxiliary control panels Power transformer Over hauling of LT motors Cleaning and painting of 144 Nos insulators Reconditioni
- TTPS ES Circle EM III Unit IV Discharging and charging of 24V DC System Batteries 220V DC System Batteries 360V UPS System batteries and 220V DC Switchyard II Batteries Cleaning and Tightness Checking of charger panels cleaning of inter cell conn
- TTPS ES Circle EM III Unit V Annual maintenance of BFPs motor coolers CEP 5A 5B coolers and Capital Overhauling of Boiler Feed Pump motor 5C and during Annual Overhauling for the year 2026 2027 or their after
- TTPS ES Circle EM III Unit V Annual overhauling of LT SWGR Buses Modules Breakers electronic controller panels auxiliary control panels Power transformer Over hauling of LT motors Cleaning and painting of 144 Nos insulators Replacing of insulato
- TTPS ES Circle EM III Unit V Discharging and charging of 24V DC System Batteries 220V DC System Batteries UPS System batteries and 48V DC Carrier Communication System Batteries at Switch Yard II Cleaning and Tightness Checking of charger panels an
- TTPS ES EM III 3Nos 245kV 240kV 120V 3V PT dismantling Erection and commissioning in Main Bus IV in switchyard II and allied works including hire charges for crane
- TTPS ES EM III Rectification of released Boiler Feed Pump Motor Cooler in Unit 4
- TTPS ES EM III Replacement of worn out area of GI earth flat by new earth flat size 50 X 10 MM and reconditioning of earth pits in ESP IV area of Unit IV
- TTPS ES EM III Rewinding of 415V AC 3 Phase 1 2KW 700 RPM Generator Transformer cooler fan motors in Unit IV V for the period of one year from the date of commencement of work
- TTPS Mech II AHP Unit I BAH Attending breakdown maintenance works in BAH I for the period from the date of commencement of work and upto 31 03 2027
- TTPS Mech II BM Dismantling Erection testing and commissioning of Silencer for Superheater safety valve in Unit IV and silencer for Electromatic Relief valve in Unit V Boiler during forthcoming 2026-2027 overhaul
- TTPS Mech II BM Full reconditioning of worn out coal nozzle tips released from Unit IV Boiler during 2026 2027 Overhaul
- TTPS Mech II BM Renewal of wornout damaged floor grills step grills handrails and its supporting structures in Unit V APH areas and Unit IV V FG duct path platform areas
- TTPS Mech II BM Rubber lining in New 150NB Pipe lines for replacement in DM Water lines from DM Plant -II to Unit-IV V CST
- TTPS Mech II BM Unit I II III Reconditioning and Reblading of wornout ID fan impellers Model AN 25e6 released from Unit I II III
- TTPS Mech II BM Unit II Replacement of wornout ID fan impellers in Unit II
- TTPS Mech II BM Unit III Re alignment of super heater radiant roof tubes in Pent house area in Unit III Boiler
- TTPS Mech II BM Unit IV V Boiler Inspection checking and opening closing of valves in Deaerator PRDS Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
- TTPS Mech II BM Unit IV V Reconditioning of coal nozzle and matching with coal nozzle tips released from Unit IV V Boiler during 2026 2027 Overhaul
- TTPS Mech II BM Unit IV V Replacement of wornout/ corroded structural supports, strengthening of weld joints and painting the steel structures of Unit IV V Boiler
- TTPS Mech II BM Unit IV V Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valve and PRDS safety valves during annual overhaul 2026 2027
- TTPS Mech II BM Unit V Inspection Rectification of emitting electrode suspension frame in Unit V ESP during annual overhaul for the year 2026 2027
- TTPS Mech II BM Unit V Overhauling of Electrostatic Precipitator AB path of Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Overhauling of Electrostatic Precipitator CD path of Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Overhauling of ID fans A B of Model NDZV 31 sidor in Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Overhauling of wind box, SADC AC DC scanner fans of Unit V Boiler during overhaul for the year 2026 2027
- TTPS Mech II BM Unit V Removal and relaying of insulation with cladding on Hot primary air duct Hot secondary air ducts and Airpreheater outlet to chimney duct areas of Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Renewal of Primary Secondary Air Duct walls and its supports of Unit-V for the year 2026 2027
- TTPS Mech II BM Unit V Replacing of eroded flue gas ducts from ESP outlet to ID Fan inlet in A, B, C D path Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Replacing of eroded flue gas ducts from the end of feeder floor to ESP inlet in B path C path of Unit V for the year 2026 2027
- TTPS Mech II BM Unit V Replacing of eroded splitter plates and divider plates in A D path of ESP inlet of Unit V during 2026 2027 Overhaul
- TTPS Mech II BM Unit V Replacing of eroded splitter plates and divider plates in B C path of ESP inlet of Unit V during 2026 2027 Overhaul
- TTPS Mech II BM Unit V Strengthening of Economizer intermediate header and rear header stub joints in Unit V Boiler during overhaul for the year 2026 2027
- TTPS Mech.II BM Unit V Replacement of wornout ESP hopper Bottom assembly and providing insulation
- TTPS Operation Circle CAD ACWPH Unit II Dismantling and Replacement of wornout, 600 NB MS pipes in Bearing Cooling Water Return line of unit II ACW system with New 600 NB MS Seamless pipes thickness 9.53 mm ASTM SA106 Gr C pipes near Mill plant area
- TTPS Operation Circle CAD ACWPH Unit II Dismantling and Replacement of wornout, 600 NB MS pipes in Bearing Cooling Water Supply and Return line of unit II ACW system with New 600 NB MS Seamless pipes thickness 9.53 mm ASTM SA106 Gr C pipes near Mill
- TTPS Operation Circle CAD CWPH II Unit IV Annual overhauling of Travelling water screen 4A to 4D for the year 2026 2027
- TTPS Operation Circle CAD CWPH II Unit V Annual overhauling of Travelling water screen 5A to 5D for the year 2026 to 2027
- TTPS Operation Circle CAD D.G.Set IV and V Attending minor repair works during overhauling of unit IV and V
- TTPS Operation Circle CAD Unit IV and V Annual overhaul Overhauling of NRVs in Sea Water Booster Pumps and Auxiliary Cooling Water Pumps of A.C.W System IV and V
- TTPS Operation Circle CAD Unit IV and V Overhauling of Heat exchangers 4A, 4B, 4C, 5A, 5B and 5C, Cleaning and Painting of Auxiliary Cooling Water Tank of Unit IV and V ACW System
- TTPS Operation Circle CAD Unit IV CW pump 6.6KV, 570 KW Jyoti make CW Pump HT Motors location 4A to 4D Cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and Painting works during the forthcoming over
- TTPS Operation Circle CAD Unit IV Overhauling of 110 KW ACWP Motor 1 No and 75 KW SWBP motor 3 Nos. at ACWS
- TTPS Operation Circle CAD Unit V CW pump 6.6KV, 570 KW Jyoti make CW Pump HT Motors location 5A to 5D Cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and Painting works during the forthcoming overh
- TTPS Operation Circle CAD Unit V Overhauling of 110 KW ACWP Motor 1 No and 75 KW SWBP motor 3 Nos. at ACWS
- TTPS Operation Circle MPM II AC Plant Rectification of vibration in blower impeller fan assembly by renewing of impeller fan blades the rod and blower casing cover and commissioning of the blower A at Air washer Unit IV model No 13.5 LLD
- TTPS Operation circle MPM II ACP Renewing the damaged roof concrete support of MS structure of the Air washer water chamber area at Unit IV
- TTPS Operation Circle MPM II Unit IV and V Mill gear box inspection complete overhauling and reassembling of gear box in Unit IV and V HP 803 bowl mills during breakdown of gear box
- TTPS Operation Circle MPM II Unit IV Attending repair works in journal door assembly and mill body of mills
- TTPS Operation Circle MPM II Unit IV Overhauling of gravimetric feeder Bunker gates HAG CAG HAD CAD and painting of cold air duct and feeder during the forthcoming annual overhaul