All works
2,149 works in State-wide works. 50 at a time.
- Revisioning of IPCV/IPSV valve cone
- Rewiring and renewal of EI, LED fittings, ceiling fans and powermains arrangements to the renovation of BC Hostel Building into Sub Treasury Office at Eraniel in Kanniyakumari District.
- Rewiring and Renewal of Electrical Installation to various Court halls, Chambers and Offices to District Combined Court Building at Mayiladuthurai in Mayiladuthurai District for the year 2026-27.
- RI Office Cum Quarters Mangalampettai
- RI Office Cum Quarters Marungur
- RI Office Cum Quarters Sirupakkam
- RI Office Cum Quarters UMangalam
- RO Law College Matlampatti
- Road Patches and Potholes
- Roadcut Restoration of CC roads made by CMWSSB (Water) and (Sewer) at Ambedkar nagar 5th and 6th st, TVK Nagar, 1st, 2nd and Extension and Mosque street (TVK Nagar Near jn) in Div-72, Unit-17, Zone-6.
- Roadcut Restoration of CC roads made by CMWSSB (Water) and (Sewer) at Vasuki nagar 1st street, Kasthuribhai colony B block 1st 2nd, and 3rd streets, and Narasimma nagar 1st st in Div-72, Unit-17, Zone-6.
- Roadcut Restoration of CC roads made by CMWSSB (Water) and (Sewer) at Venkatesapuram new colony 1st, 3rd st, New TVK Nagar main st, Sathiyavani muthu nagar 1st,4th and 6th st,MS muthu Nagar (Tenements), Narasimman Nagar 5th st in Div-72,U-17,Z-6.
- ROLL CHANGING WORK IN BOARD MACHINE AT TNPL UNIT - II
- S.12 NCTPS II ES circle MRT Division Unit I Annual Overhauling 2026 27 Maintenance Works Contract under open tender Basis
- S.15 NCTPSII ES circle CI Division FSSS subdivision Carrying out Annual overhaul maintenance activities of CI equipments of FSSS SADC and Allied areas in UnitI 600MW for the year 2026 27
- S.19 NCTPS II ES circle EM II Dn Boiler Aux Mtce SDnI Cleaning of Cooler and Heat barrier in BCW Pump Cum Motors 1A 1B and 1C at 24 Mtr Boiler elevation during the COH period 2026 of UnitI
- S.26 NCTPS II ES circle EM I Dn Sub Division II Cleaning and tightness checking of 11KV 3 3KV 415V Switchgear buses and outgoing cables 11KV 33KV SPBD Bus ducts GCB Dry type transformers during the Annual overhauling of Unit I for the year 2026
- S.27 NCTPSII ES circle CI Division TG EAST Sub Division UnitI Carrying out Annual Overhaul Maintenance activities of CI equipment of HP Bypass System LP Bypass System TDBFPs and EAST Allied areas
- S.29 NCTPSII ES circle CI Division BOP subdivision UnitI Carrying out Annual Overhauling works of CI equipment in Burner Tilt CAD PA FD Actuators during AOH
- S.32 NCTPS II ES circle EMI Dn GM SubDn Carrying out Annual overhauling estimate for UnitI Generator and its Auxiliaries in 600MW for the Year 20262027
- S.33 NCTPSII ES circle EMI Dn SDNI Unit I Inspection Tightness checking of Complete 400KV TWIN Moose ACSR Overhead Conductor with Clamps and Cleaning of both strain and Suspension insulators for TG Bay to 400KV GIS GT4 Bay during the annual ove
- S.36 NCTPSII ES circle CI Division TG EAST subdivision Unit I Carrying out annual overhaul maintenance activities of 600MW Main Turbine sensors and Inner bearing thermocouples in pedestal 1 to 8 and CI equipments in EAST allied areas.
- S.46 NCTPSII ES circle EM I Dn Inspection Cleaning and tightness checking of R Y and B phase IPBD and epoxy support insulators of 21KV bus duct during the Annual overhauling of Unit I for the year 2026 27
- S.49 NCTPS II ES circle EMI Dn Sub Division I Cleaning and painting work of 5 MVA VFD Service Transformers 4Nos 35 MVA Compressor Transformer1No2 MVA Auxiliary Transformers 3 Nos and 16 MVA ESP Service and Raw water Transformers 9 Nos at Site of
- S.50 NCTPSII ES circle EMI Dn Sub Division I UnitI Removal and refixing of 21KV bellows and flexible for conducting Winding resistance test and also carrying out Hot Oil circulation in 50 MVA Unit Transformer UT1A and UT1B during the annual over
- SALES OF PRESSMUD/SSIVA/513/2010/SALES
- School Development - 6th Fincne 2026-27 Kolathupalayam Tp Tiruppur District
- SCHOOL DEVELOPMENT SCHEME 6TH FINANCE 2026 - 2027 Anganwadi Mulanur TP
- SCHOOL IMPROVEMENT GRANT -6TH FINANCE COMISSION 2026 -2027
- School Improvement Grant 2026-27 Construction of New Model Anganwadi Building at Viruthanganallur in Manalmedu Town Panchayat.
- SCHOOL IMPROVEMENT SCHEME 6TH FC 2026-2027
- SE M II Circle AHP Dn Unit III AOH 2026 27 Attending Leaks Air ingress in Ash discharge pipes connected with hoppers of ESP by dismantling spool piece sleeve and bellows changing of damaged gaskets bolt and nuts and assembling the same to avoid air i
- SE/O/CBE/Arasur Lines/ ET- 25/2026-27,dated. 28.10.2026
- SE/O/CBE/Coimbatore Lines/ ET- 24 /2026-27,dated. 28.10.2026
- SE/O/CBE/F. Arasur Vehicle/ ET.22/2026-27, Dt.27.10.2026
- SE/O/CBE/F.PNPM Vehicle/ ET.19/2026-27, Dt.15.10.2026
- SE/O/CBE/F.SEOCBE Vehicle/ ET.21/2026, Dt.27.10.2026
- SE/O/CBE/Thudiyalur Lines/ ET- 23 /2026-27,dated. 28.10.2026
- Selection of a Managed Service Provider MSP for Design, Setup, Operation and Maintenance of 5 Pilot Model Registration Hubs MRHs in Phase 1 and 20 Twenty MRHs after successful pilot for a Contract Period of 5 years, extendable upto 2 years
- Selection of a System Integrator (SI) to operate and maintain the Integrated Dairy Management System (IDMS) Project for three years at various locations.
- Selection of Concessionaire for Establishment of 2400 TPD Municipal WtE Facility including Scientific Landfill at Keerappakkam for Chennai-Tambaram-Avadi Cluster, under Design, Build, Finance, Operate and Transfer (DBFOT) Model on PPP Mode
- Selection of Concessionaire For Redevelopment of Old Bus Stand At Hosur City Municipal Corporation Along With Commercial Development On Design, Build, Finance, Operate And Transfer DBFOT Basis Under PPP Mode
- Selection of Concessionaire for Setting up 1000 TPD Waste Handling Facility comprising 700 TPD Compost Processing at Perungudi Dumpsite at Chennai Greater Chennai Corporation under Design, Build, Finance, Operate and Transfer (DBFOT) Model on PPP Mod
- Selection of Consultant for Preparation of Detailed Project Reports Detailed Designs and Bill of Quantities for the project of Pedestrian Friendly Street Safe Access to School and Traffic Island Improvements in ACMC
- Servicing of Vacuum Circuit Breakers and Testing and Calibration of relays
- Shifting of Air Conditioner unit, Refilling of Refrigerant and renewal of 5kVA stabilizer to Circuit House Buildng at Coutrallam in Tenkasi District.
- Shifting of EB Poles for Part I and II the work of Construction of High Level Bridge at Km 15 2 Udaiyarpatti Seevalaperi Road in lieu Existing Causeway
- Ship Chartering
- Ship Chartering
- SIZING OF YARN